Before an in vitro diagnostic (IVD) device can be placed on the European market, manufacturers must prove conformity with the In Vitro Diagnostic Regulation (IVDR) (EU 2017/746). This is achieved through specific assessment procedures outlined in Annexes IX to XI.
The application documentation aligns with requirements for Quality Management System (QMS) assessment (Annex IX section 2 and Annex XI section 3). Technical documentation guidance follows Annex II.
Both BSI (UK/NL) and IVD manufacturers share the same objective: to facilitate efficient technical documentation reviews while minimizing unnecessary delays in certification, without compromising regulatory compliance.
In practice, delays are most caused by:
- Missing information.
- Information that exists but is difficult to locate.
To address these, BSI has proposed guidelines known as the IVDR Documentation Submissions: Best Practice Guideline.
Initial Application Package for QMS
When applying under Annex IX, manufacturers must provide a defined set of documents that form the foundation of the review process.
Where conformity assessment is performed under Annex X (Type Examination), the submission focuses on device-specific technical documentation rather than QMS assessment. In such cases, manufacturers should confirm the applicable annex with BSI and align the submission scope accordingly.
Key Requirements
- Manufacturer name and registered address, plus all sites covered by the QMS.
- Authorized representative details, if applicable.
- Single Registration Number (SRN) for EUDAMED access (mandatory once implemented).
- Information on devices covered by the QMS.
- Declaration that no other Notified Body is reviewing the same QMS.
- Draft EU Declaration of Conformity (Article 17, Annex IV).
- Documentation of the manufacturer’s QMS.
- Description of procedures to meet obligations under IVDR.
- Procedures to ensure QMS remains adequate and effective.
- Documentation of post‑market surveillance (PMS) and post‑market performance follow‑up (PMPF).
- Procedures to keep PMS and PMPF updated, aligned with vigilance requirements (Articles 82–87).
- Documentation of the performance evaluation plan.
- Procedures to update the performance evaluation plan based on state of the art.
- Technical documentation (Annex II) for each device requiring a product‑specific certificate, or representative devices selected by BSI.
- Where representative devices are used, the rationale for representativeness (e.g. intended purpose, design, technology, risk class, and performance characteristics) should be clearly documented and agreed with BSI.
Table: Elements of the Initial Application Package
| Element | Purpose | Notes |
| Manufacturer details | Identify responsible entity | Include all sites |
| SRN | Access EUDAMED | Mandatory once live |
| Device information | Define scope | Cover all devices |
| Declaration | Avoid duplication | Confirm exclusivity |
| Draft DoC | Show compliance intent | Article 17, Annex IV |
| QMS documentation | Demonstrate adequacy | Include procedures |
| PMS/PMPF | Show vigilance | Articles 82–87 |
| Performance plan | Evidence of evaluation | Keep updated |
| Technical documentation | Device compliance | Annex II |
Incomplete or nuclear elements within the initial application package may result in clarification requests and delays during subsequent stages of the review.
Submission and Technical Documentation Contents
Every technical documentation review requires three things:
- Context – explanation of what is being requested and why.
- Evidence – technical documentation proving compliance.
- Authorization – permission for BSI to conduct the review.
- Administrative information must include document index with titles/revision history, regulation confirmation, and changes to standards since last BSI review (with gap analysis for state-of-the-art compliance).
Cover Letter
The cover letter provides a high-level overview of the submission and supports efficient allocation of the review.
It should include:
- CE Certificate references (if known).
- Type of review (new product, design change, shelf life extension, etc.).
- Product description, classification, conformity route, analytes, and technology.
- BSI reference numbers (SMO #).
- Explanation of what has been submitted, how compliance is demonstrated, and what is affected or not affected.
Where appropriate, a tabulated overview may be used to clearly indicate the sections of technical documentation impacted by the submission.
Example Table Format
| Technical Documentation Section | A/NA? | Evidence Submitted | Impact on Compliance / Rationale |
| Risk Management | A | Updated Risk Management file | Packaging change affects risk profile |
| Stability Data | NA | No new data | Shelf life unchanged (justify with 3-lot real-time data) |
Technical Documentation
Submissions should be stand‑alone. Manufacturers should not rely on previous submissions. All referenced reports and supporting documents should be included in full to ensure relevance and facilitate efficient review.
Manufacturers should ensure clear traceability between the General Safety and Performance Requirements (GSPR), risk management, performance evaluation, and the supporting evidence within the technical documentation (e.g., analytical sensitivity/specificity, limits of detection, and GSPR checklist).
Authorization
BSI will commence review activities only after receipt of one of the following:
- A signed approved quotation , or
- A signed Work Authorization Form (MDF4510–MDF4514 depending on location).
Verification of Performance
For Class D devices (and other classes where required by the Notified Body)), kits must be sent to an EU Reference Laboratory (EURL) to verify performance using a Device Submission Form with device summary for protocol establishment
This step is discussed in more detail during application, but manufacturers should plan early, as performance verification is critical and can add significant time if not prepared.
Performance verification activities are expected to support scientific validity, analytical performance, and clinical performance as defined in Annex XIII of IVDR.
Verification of Manufactured Product (Class D Only)
Class D devices are subject to the highest level of scrutiny under IVDR. Verification of performance is mandatory andis carried out in parallel with the documentation review with the active involvement of the EU Reference Laboratory (EURL).
Manufacturers must send batches of product to the EURL. These batches establish performance criteria and must meet the manufacturer’s QC specifications. They must also match the configuration described in the technical documentation. Every component should be clearly labelled with name, lot number, expiry date, and accompanied by the final draft Instructions for Use (IFU).
Ongoing batch release requires additional documentation:
- Final QC release testing performed by the manufacturer.
- Labelling details, including component and box labels, lot numbers, expiry dates, and IFU.
Any deviation between the tested product and the documented configuration may result in delays to certification.
Submission Method
BSI prefers submissions via its secure document upload portal. This route is faster, safer, and more efficient.
If portal access is not available, manufacturers should contact their Scheme Manager or administrative support to set it up. Email submissions are possible but only for limited-scope applications with a small number of documents.
Hard copies are not required. If hard copies are sent, they must be converted into electronic format by BSI’s administration team. This may add time and cost to the review.
👉 Best Practice Tip: Always use the portal. It reduces administrative overhead and ensures documents are archived correctly.
Document Format
Formatting is often underestimated, but it directly impacts review speed. Poorly formatted files slow down reviewers and increase costs.
Language
- The official language of BSI is English.
- All technical documentation and test results should be submitted in English.
- Documents in other languages may require translation, adding time and cost.
- Even where assessments areconducted in local languages, but full English documentation must still be available.
- For Class A devices placed on the market in sterile or defined microbiological conditions, documentation may be accepted in another EU language where permitted by the Competent Authority and supported by BSI auditor competence.
Electronic File Format
Documents should ideally be paginated, searchable, bookmarked PDFs.
Key rules:
- Avoid locked or file‑protected PDFs.
- Use bookmarks to aid navigation.
- Collate related documents into portfolios where possible.
- If multiple small files are uploaded, indicate the order for compilation.
- Logical numbering of files (1, 2, 3…) is preferred.
- BSI will apply OCR, pagination, and headers/footers for archiving purposes.
Optical Character Recognition (OCR)
- Submissions scanned from printed pages should use OCR.
- Non-searchable submissions may require conversion, which can extend review timelines.
Bookmarks
Bookmarks should highlight major sections of Annex II or GHTF STED. Random bookmarks generated during PDF conversion should be edited to provide clear references.
👉 Best Practice Tip: Clear bookmarks save reviewers time and reduce the number of clarification requests.
Pagination
- Each page should have a sequential number starting with 1.
- PDF files are automatically numbered, but clarity is needed when referencing page numbers.
- Pagination is recommended to support traceability, although it is not mandatory.
Signatures
Signatures are required for all signed documents, including Work Authorisation Forms and quotes.
Accepted formats:
- Digital signatures.
- Scanned signature pages inserted into the document.
- Marker pages indicating signatures provided separately.
Submission Process
The submission process follows a clear sequence:
- Notify BSI of your application.
- New clients: contact the sales team.
- Existing clients: contact your Scheme Manager or administration team.
- Email and phone are preferred.
- Complete the Work Authorisation Form if required.
- Ensure the form is signed, dated, and includes:
- Company name and title of submission.
- Details of affected certificates (CE numbers for IVD).
- Review rate required (Standard or Fast Track).
- Submit the signed quote or Work Authorisation Form.
- Once received, BSI assigns a reviewer.
- A unique identification number (SMOxxxxxx) is issued.
- Reference this number in all correspondence.
- Review begins once both the submission and authorization are received.
- Any changes to the device, technical documentation, or quality system occurring during an ongoing review should be promptly communicated to BSI, as such changes may impact the scope or validity of the assessment.
Additional Topics to Consider
When preparing technical documentation, manufacturers should also consider:
- Personnel support: Ensure RA, QA, R&D, and manufacturing staff are available during reviews. Quick responses close questions faster.
- Document availability: Avoid pointer systems. Provide key documents upfront. Reviewers need both conclusions and supporting evidence.
- Certificate scope: Adding new products or changing existing ones may affect QMS certificate scope. Discuss scope early with your Scheme Manager.
- Sub‑contractors: Significant suppliers must be listed on QMS certificates. Non‑EU ISO 13485 certificates may require audits. Sub‑contracted design activities must be controlled.
- Accessories: Provide descriptions, classifications, and references for all accessories.
- Novelty: New technologies or analytes may require external consultations. Fast Track timelines may not apply.
- Desktop audits: For remote audits, include all documents upfront. Missing information causes delays.
Manufacturer Personnel Support
Successful reviews depend on more than documents. They also depend on people. Manufacturers must ensure that regulatory affairs (RA), quality assurance (QA), research and development (R&D), and manufacturing staff are available during on‑site or dedicated reviews.
When questions arise, quick responses close them faster. Delays often occur when reviewers wait for clarifications. Having the right personnel ready demonstrates preparedness and reduces time to certification.
Document Availability
Some companies use a “pointer system” for technical documentation. This means referencing documents rather than providing them directly. While convenient internally, it slows down external reviews.
Reviewers need to see both the manufacturer’s conclusions and the objective evidence supporting them. If key documents are missing, the first round of questions will focus on requesting them. This delays the start of the full review.
👉 Best practice: provide all essential documents upfront.
Certificate Scope
Adding new products or changing existing ones can affect the scope of the associated Quality Management System (QMS) certificate. If the scope does not cover the analyte, product, or technology, additional work is required to re‑issue certificates.
This may involve:
- Reviewing sufficient evidence to support scope change.
- Conducting QMS audits or microbiology audits in addition to technical documentation review.
If in doubt, manufacturers should discuss scope with their BSI Scheme Manager before submitting. Early coordination prevents surprises later.
Sub‑contractors
Changes to subcontractors or suppliers must be reflected in the QMS certificate and the Unannounced Audit Visit schedule.
Key points:
- All significant subcontractors or crucial suppliers must be listed.
- Suppliers without a valid ISO 13485 certificate from an EU Notified Body may require audits.
- Even certified suppliers may need verification visits depending on their activities.
- Sub‑contracted design activities must be controlled.
👉 Manufacturers should clarify subcontractor details in the application to avoid delays.
Accessories
Accessories associated with a device must be documented. Provide:
- A brief description of each accessory and its use.
- Classification and rationale for classification.
- Technical documentation references (file name, issue status, date).
Accessories may seem minor, but they can affect compliance and classification.
Novelty
New technologies or analyses often require additional time. External consultations may be needed, and these do not always fit within Fast Track timelines.
Manufacturers should discuss novelty with their Scheme Manager to select the most appropriate review option. Planning ahead avoids unrealistic expectations.
Desktop Audits
Surveillance audits may be conducted on‑site or remotely as desktop audits. On‑site audits allow real‑time requests and clarifications. Desktop audits require complete documentation upfront.
For desktop audits, provide:
- Main technical file body and key supporting documents.
- Manufacturer’s current number of employees.
- Summary of changes to the device since the last audit.
- Information on engagement with global regulatory bodies.
- Details of changes to the quality system or management.
Additional review time may be required if documentation has poor traceability or incomplete information.
Common Pitfalls in Advanced Stages
- Missing subcontractor details.
- Incomplete accessory documentation.
- Scope changes not discussed early.
- Novel technologies underestimated in timelines.
- Poor traceability in technical files during desktop audits.
Avoiding these pitfalls requires proactive planning and clear communication with BSI.
TS Quality & Engineering’s Role
At TS Quality & Engineering, we guide clients through these advanced considerations. Our support includes:
- Ensuring personnel readiness during reviews.
- Structuring document availability to avoid pointer systems.
- Managing certificate scope changes with early coordination.
- Auditing subcontractor compliance and documentation.
- Preparing accessory and novelty documentation.
- Streamlining desktop audit preparation with traceable files.
We believe compliance is not just about meeting requirements. It is about building trust with regulators and ensuring smooth market access.
Conclusion
IVDR submissions are complex. They require careful preparation, structured documentation, and proactive management of advanced considerations. From personnel support to subcontractor control, every detail matters.
Manufacturers who plan, provide complete evidence, and coordinate with BSI reduce delays and strengthen their compliance posture.
Early alignment with BSI expectations and structured preparation of documentation are key factors in achieving predictable and efficient IVDR conformity assessments.
TS Quality & Engineering stands ready to support every step of the journey. With our expertise, your submission will be complete, compliant, and credible.
British Standards Institution (BSI), 2019. IVDR Documentation Submissions – Revision 1. March 2019, p.3 of 24. Available at: <https://www.bsigroup.com/globalassets/localfiles/en-za/iso-13485/ivdr-best-practice-documentation-submissions-sa.pdf> [Accessed 5 January 2026].